WORKHydraulics and Hydrology

CONSTRUCTION OF STORM DRAINAGE CANAL M-312-313 OTB VALLE HERMOSO NORTE D7

General Description

The M-312-313 stormwater drainage canal construction project in the OTB Valle Hermoso Norte, District 7, Cochabamba, has as its main objective to improve the drainage infrastructure and reduce the risk of flooding in the area. This work is crucial for the efficient management of rainwater, protecting residents and their property during the rainy season. The construction of this canal will allow for a more effective evacuation of water, preventing accumulations that can cause damage to streets and properties. The project not only includes the construction of the drainage canal, but also contemplates the repair and maintenance of adjacent infrastructure, ensuring effective integration with the existing urban network. Additionally, sustainable practices were implemented, using high-quality materials to ensure the durability and efficiency of the system. This effort contributes to local economic development, generating employment during its execution, and improves the quality of life of the community's inhabitants by offering a safer and healthier environment. With this project, the commitment to the well-being of the population and the improvement of urban infrastructure in Cochabamba is reinforced, complying with the technical and environmental regulations in force in Bolivia.

Gallery

Imagen 1
Imagen 2

Technical Area

Hydraulics and Hydrology

Type of Service

WORK

Location

Cochabamba, Bolivia

Period

2022

← Return to portfolio